Commissioning starts at design.
Catch it on paper, not in the ceiling. We check every sheet against the owner's requirements, the design intent and Title 24 — then verify every system before handover.
ILLUSTRATIVE DRAWING · NOT A PROJECT RECORD
HOW IT WORKS
From the first drawing to a building that works.
One commissioning team across design, construction and handover.
- DESIGNReview the designDesign Alignment Report against OPR, BOD and Title 24.
- CONSTRUCTIONVerify the buildSubmittal review, site checks and functional testing of every system.
- HANDOVERHand over a building that worksSystems manual, operator training, final report and warranty-period review.
DESIGN REVIEW DELIVERABLE
The Design Alignment Report
Issued before construction, when fixes are still cheap.
- 01OPR check — Does the design deliver what the owner asked for
- 02BOD check — Do the drawings match the stated design intent
- 03Title 24 §120.8 — Code review and signed design review checklist
- 04Commissioning readiness — Sequences, test requirements and Cx duties in the specs
- 05Issues log — Every finding by sheet, severity and fix, tracked to close
SCOPE
What we commission
- HVAC and controls
- Lighting and lighting controls
- Electrical
- Plumbing and domestic hot water
- Building automation
- Building envelope
- Solar and storage
TWO SERVICE LEVELS
Code scope, or the whole building.
Threshold summary only. Some building types, such as certain warehouses and open parking garages, may be excepted; confirm with the enforcing agency for each project. LADBS commissioning reference · CEC §120.8 commissioning and design-review form
FOR ARCHITECTS AND ENGINEERS
Need an independent Title 24 design reviewer?
We review and sign for your projects — fast, fixed fee.
A DIRECT NEXT STEP
Not sure what your building needs?
Send the address. We'll come back with a clear next step in one business day.